| Project Name | Design and Installation of Solar Off Grid System | 
| Client | Mary Queen of Peace | 
| Year | 2024 | 
Mary Queen of Peace in Chilomoni Blantyre is an education institution providing higher learning education in Blantyre. Through its project of constructing girls hostels in Mitsidi for learners, contracted Irritech Solution to design and install a Solar Off Grid system for their learners hostels accommodating 150 students in four hostels constructed. For each of the hostels the following system components have been installed;
» 10x425W Trinasolar Vertex monocrystalline PV modules. Providing a total of 4.25Kw power.
» 1x5.5kW Sunsynk Hybrid inverters
» 2x5.12kW BSL LiFePO lithium solar energy storage




| Project Name | Design and Installation of Solar Min-Grid System | 
| Client | Krizevac | 
| Year | 2023 | 
Krizevac in Chilomoni Blantyre through its project of constructing Technology Park in Chilomoni, contracted Irritech Solution to design and install a Solar Mini grid for their first university building. Below are the technical details of the system.
» 73x555W Longi monocrystalline PV modules. Providing a total of 40.5Kw power.
»3x15KVA Victron Energy Quattro Hybrid inverters (total 45KVA)
» 1x10Kw and 1x15Kw Fronius grid-tie inverters (total 25KW inverter power).
» 2x80/64 Freedom Won Lite LiFePO4 Lithium Energy Storage Batteries providing 160kWh power.
The system was designed and installed for the building 01 (a three-floor building) at the Technology Park as an off-grid system.





| Project Name | Supplying and Installation of PV solar Water Pump (Phalombe) | 
| Client | Inter Aid | 
| Year | 2023 | 
Inter Aid Phalombe, an NGO, contracted Irritech to install solar water supply systems in four locations as part of their Agroforestry project. These systems, including submersible pumps, solar modules, tank stands, and 500-litre tanks, were installed after conducting pumping tests in existing water sources. The project has enabled the community to access water near their agroforestry nurseries, facilitating increased seedling production for tree planting in Phalombe.
| Project Name | Supply and installation of solar backup system for server room | 
| Client | Beehive | 
| Year | 2023 | 
A 10Kwh backup system was installed to ensure no power interruption for a server room. 2x5.12Kwh BSL powerline 5 wall mounted energy storage bank, and 2x5Kw Luxpower hybrid inverters.
Have your sever room power backed up by Irritech.




| Project Name | Construction of Incinerator and Placenta pit (Phalombe Chiringa) | 
| Client | InterAid | 
| Year | 2023 | 
Inter Aid Phalombe, in collaboration with Phalombe DHO, contracted Irritech to construct an incinerator and placenta pit at Chiringa Health Center, which were in poor condition. Within four weeks, Irritech completed the construction and handed over the facilities. Staff at the health center can now utilize these crucial structures, essential for any health center with a maternity wing.
| Project Name | Drainage System Design and Construction (Phalombe) | 
| Client | Mwachiko Investments | 
| Year | 2023 | 
Due to waterlogged conditions in Phalombe, Irritech solution designed a drainage system at their newly constructed office park. A 171m underground drained was constructed to drain underground water which was filling the manholes. All the works were completed in three weeks and by the 5th week the impact of the drain was visible on the lowering of the water table within the office premises. Now the offices are no longer on waterlogged area.


| Project Name | Borehole Drilling (Blantyre Chileka) | 
| Client | Beehive | 
| Year | 2023 | 
Beehive through their farming project in Chileka Blantyre, a borehole drilling construction was done for their main water source on the farm. A submersible pump, 10m3 reservoir and a pipe network were installed to irrigate the newly established orchard and other farming projects.
| Project Name | Chimembe Water supply system | 
| Client | SEIBO-Maria | 
| Year | 2022 | 
Makapwa CBCC, within Chimembe village in Chileka, lacked access to clean water, relying on open water sources like rivers and hand-dug shallow wells. With the support of SEIBO Maria, Irritech developed a solar water supply system for Chimembe CBCC, ensuring access to safe water. This initiative also benefitted the wider community. The project included borehole drilling, a solar submersible pump, rack, pipe network, a 3.5m masonry tank tower, a 10m3 tank reservoir, and three water tapping points, providing the community with their first-ever access to tap water.